
Detention invoice: the two dates it does not have to carry
A detention invoice bills the days a line's container stayed out of the line's control after leaving the terminal gate and before the empty came back. In the US it is the same regulated instrument as a demurrage invoice, separated only by which asset was occupied. The rules require the free-time dates and the days charged, but not the gate-out or empty-return dates the clock turns on.
- Detention invoice
- The invoice a shipping line or an NVOCC issues for the days its container remained outside the line's control after leaving the terminal, stating the bill of lading and container references, the free-time period, the rate per tier and the days charged.
Two invoices arrive for the same container and the desk assumes one of them is a duplicate. They are not. One is for the box sitting inside the terminal; the other is for the box being outside it. The first is a demurrage invoice. The second is this one, and it is the half that most desks have never read field by field, because the amount is usually smaller and the sender is usually the line you deal with every week.
What it bills
A detention invoice charges you for time the carrier’s equipment was out of the carrier’s system. The meter starts when the box leaves the terminal (gate-out) and stops when the empty is accepted back at the nominated depot (empty container return). In between, your yard, your warehouse and your haulier’s queue are all on the line’s clock.
That is the whole of the difference. US law does not define detention separately from demurrage at all. It defines them in one sentence, as
any charges, including “per diem” charges, assessed by ocean common carriers, marine terminal operators, or non-vessel-operating common carriers related to the use of marine terminal space (e.g., land) or shipping containers, but not including freight charges.
Marine terminal space is demurrage. The shipping container is detention. The asset decides which word goes on the invoice, and nothing else does, which is why the same billing rules, the same required fields and the same thirty-day deadlines govern both.
The two dates it does not have to carry
Here is the gap worth knowing before the next one lands.
The required minimum information on a detention invoice is specific and long. On timing it covers the invoice date and due date, “the allowed free time in days”, the start date and the end date of free time, the container availability date on an import, the earliest return date on an export, and “the specific date(s) for which demurrage and/or detention were charged”.
Read that list again against the clock it is billing. Gate-out is not in it. The empty return is not in it. The two events that begin and end a detention charge are the two events the invoice is not required to show you.
What you get instead is the free-time window and an assertion of which days were charged. Whether those days actually sit between your gate-out and your empty return is something only your own records can answer: the equipment interchange receipt at the gate, and the receipt from the depot that took the box back. A detention invoice is therefore checked from the outside in: start with your two dates, then see whether the line’s billed days fall inside them.
How a detention charges calculation actually runs
A detention charges calculation is four numbers, and only two of them are on the invoice.
- The start. The day the box passed the terminal gate, from your equipment interchange receipt.
- The free days. The allowed free time in days, which the invoice must state, counted on the basis the tariff or contract sets.
- The end. The day the depot accepted the empty, from the depot’s receipt.
- The rate per tier. Detention is rarely one rate. The invoice has to carry the rate for each tier and the days charged in each, so a fourteen-day overstay can span two or three rates.
Chargeable days are the days between the start and the end, less the free days, priced tier by tier. The arithmetic is trivial. The sourcing is not: steps one and three come from your own paperwork, because the rules do not make the line print either date. So a detention charges calculation done from the invoice alone is checking the carrier’s figures against the carrier’s own assertion of the dates.
One thing the calculation must not quietly absorb: a day the box sat inside the terminal is demurrage, not detention. If the billed days start before gate-out, the line has billed storage at an equipment rate. See dwell time for why one container carries several different day counts at once.
What else has to be on it
| Group | Fields the invoice must carry |
|---|---|
| Identifying | Bill of lading numbers · container numbers · port of discharge (imports) · the basis for why you are the liable party |
| Timing | Invoice date · due date · allowed free time in days · free-time start · free-time end · container availability date (imports) · earliest return date (exports) · the specific dates charged |
| Rate | Total due · the rule the rate comes from · the rate or rates themselves |
| Dispute | A contact for questions and waiver requests · a digital route to what you must supply · defined timeframes |
| Certifications | That the charges comply with the Commission’s demurrage and detention rules, and that the billing party’s own performance did not cause or contribute to the charge |
The rate line is the one that quietly matters most. The invoice has to name “the applicable detention or demurrage rule” the daily rate is based on, and the rule lists the four places it can live: the tariff name and rule number, the terminal schedule, the service contract number and section, or a negotiated arrangement. Three of those four you can read. The fourth you cannot, unless your own company signed it. So a line citing a service contract section is citing a document only your file holds, and the free-time figure it asserts is checkable in exactly one place.
Missing a field is not a discount
The consequence of an incomplete invoice is unusually blunt for a billing regulation:
Failure to include any of the required minimum information in this part in a demurrage or detention invoice eliminates any obligation of the billed party to pay the applicable charge.
Not reduced. Eliminated. And it applies field by field, which is why the table above is worth running down on the day an invoice arrives rather than on the day somebody questions it.
The timing rules work the same way. The line has thirty calendar days from the date the charge was last incurred to issue the invoice, and if it does not, “the billed party is not required to pay the charge”. An NVOCC billing you for detention gets its own thirty days from the date of the invoice it received, which is how a detention charge can reach you months after the box went back and still be inside the rules, and also how it can fall outside them. If the line billed the wrong company first, the corrected invoice still has to be out inside thirty days of the charge last accruing; the clock runs from the charge, not from the correction.
When the empty cannot go back
Detention exists to get the box returned. When returning it is impossible, the charge stops doing the job it is there to do, and the regulator says so directly:
Absent extenuating circumstances, practices and regulations that provide for imposition of detention when it does not serve its incentivizing purposes, such as when empty containers cannot be returned, are likely to be found unreasonable.
A depot that is full, a return appointment that cannot be booked, a lane the line has suspended: each is a reason the charge may not stand, and each is only as good as the record of it. The depot, the date, the time, the appointment reference and the name of whoever refused the box: captured on the day, that is evidence. Reconstructed six weeks later from memory, it is an argument.
Why the names are such a mess
If this all feels harder than it should be, the Commission has noticed too. In weighing whether a practice is reasonable it may consider “the extent to which the definitions differ from how the terms are used in other contexts”, a polite way of recording that the industry uses one word for several charges and several words for one. Per diem is the clearest case: on the container it is detention under another name, and on a chassis it is not covered by these rules at all. Two lines, identical spelling, different rights.
The practical consequence for a desk is that you cannot sort the invoices by their titles. You sort them by which asset was occupied and which clock was running, and then you check the dates the invoice did not have to print.
What a desk actually needs to hold
Every field above has to be matched against something, and almost none of it lives in one place: the gate-out is on the haulier’s interchange receipt, the empty return is on the depot’s, the free time is in the contract or the tariff, and the dates charged are on a PDF that arrived by email. Holding all of it, per container, is the job that demurrage and detention software that holds the gate dates exists to do. Not to argue the charge, but to have the two dates ready when the invoice turns up asserting a third.
If the charge is already on the table, the route after that is a charge complaint, where the burden of proving the charge reasonable sits with the party that raised it.
Questions traders ask
What is a detention invoice?
The bill a shipping line or an NVOCC issues for the days its container stayed out of the line's system after the box left the terminal gate and before the empty was returned. It is equipment rent, not storage, which is what separates it from a demurrage invoice: demurrage bills the box sitting inside the terminal, detention bills the box being out. One late document pack often triggers both, and they can arrive from different parties.
What is the difference between a demurrage invoice and a detention invoice?
The asset, and nothing else in law. US rules define demurrage and detention together as any charges "related to the use of marine terminal space (e.g., land) or shipping containers" — terminal space is demurrage, the container is detention. The same billing rules, the same required fields and the same thirty-day deadlines apply to both. The practical difference is which clock is running: demurrage before the gate, detention after it.
Which field on a detention invoice is most often wrong?
The one the rules do not make the line print. A detention charge accrues from the day the box left the gate to the day the empty was returned, and neither date is in the required minimum information. What is required is the allowed free time in days, the start and end dates of free time, and the specific dates charged. So check the billed dates against your own equipment interchange receipts — the gate-out and the empty return — because the invoice does not have to show them to you.
What does a detention invoice have to contain in US trades?
Four groups of fields. Identifying: the bill of lading numbers, the container numbers, the port of discharge on an import, and the basis for why you are the party liable. Timing: the invoice date and due date, the allowed free time in days, the start and end of free time, the container availability date on an import or the earliest return date on an export, and the specific dates charged. Rate: the total due, the rule the rate comes from — the tariff name and rule number, the terminal schedule, the service contract number and section, or the negotiated arrangement — and the rate itself. Dispute: a contact, a digital route to what you have to supply, and defined timeframes. Plus two certifications from the line.
What happens if a detention invoice is missing a required field?
The obligation goes. The rule is one sentence: failure to include any of the required minimum information "eliminates any obligation of the billed party to pay the applicable charge". It is not a discount and it is not a dispute you have to win on the merits — the charge is not owed. Which is why the invoice is worth reading field by field on the day it arrives rather than after you have paid it.
How long does a carrier have to send a detention invoice?
Thirty calendar days from the date the charge was last incurred. Miss it and "the billed party is not required to pay the charge". An NVOCC gets its own thirty days from the date of the invoice it received, and if it bills the wrong person it still has to get the corrected invoice out inside thirty days of the charge last accruing — the clock runs from the charge, not from the mistake.
Can detention be charged when the empty cannot be returned?
It can be charged, and it is the weakest kind of charge there is. The regulator's own interpretation says that, absent extenuating circumstances, imposing detention when it does not serve its incentivising purpose, "such as when empty containers cannot be returned", is likely to be found unreasonable. A refused or unavailable return appointment is therefore worth documenting the day it happens, with the depot, the time and who said no.
How are detention charges calculated?
Chargeable days multiplied by the rate for each tier. The chargeable days are the days between gate-out and the empty return, less the allowed free time, and the rate is whatever tier each of those days falls in — detention is usually banded, so one overstay can span two or three rates. The catch is where the dates come from. The invoice has to state the allowed free time in days and the specific dates charged, but not the gate-out date or the empty-return date, so a detention charges calculation you can defend is built from your own equipment interchange receipt and the depot's receipt first, and only then compared with the line's billed days.
Is a per diem invoice the same as a detention invoice?
Usually, on the container. US rules fold "per diem" charges into the definition of demurrage and detention, so a per-diem line for the container is a detention charge wearing another name. A per-diem line for a chassis is not covered, which means two lines spelled the same way on one invoice can carry different rights. Check which asset each line is renting.
Sources
- 46 CFR part 541, Demurrage and Detention (US Federal Maritime Commission) — § 541.1, the part "establishes the minimum information that must be included on or with demurrage and detention invoices"; § 541.2(a), it governs "any invoice issued by an ocean common carrier, marine terminal operator, or non-vessel-operating common carrier for the collection of demurrage or detention charges"; § 541.3, "Demurrage or detention mean any charges, including 'per diem' charges, assessed by ocean common carriers, marine terminal operators, or non-vessel-operating common carriers related to the use of marine terminal space (e.g., land) or shipping containers, but not including freight charges", and "Billed party means the person receiving the demurrage or detention invoice and who is responsible for the payment"; § 541.4 [Reserved]; § 541.5, "Failure to include any of the required minimum information in this part in a demurrage or detention invoice eliminates any obligation of the billed party to pay the applicable charge"; § 541.6(a) identifying, (b) timing — including (b)(3) "the allowed free time in days", (b)(4) and (b)(5) the start and end dates of free time, (b)(6) "For imports, the container availability date", (b)(7) "For exports, the earliest return date", (b)(8) "The specific date(s) for which demurrage and/or detention were charged" — (c) rate, including (c)(2) "the applicable detention or demurrage rule (e.g., the tariff name and rule number, terminal schedule, applicable service contract number and section, or applicable negotiated arrangement)", (d) dispute, (e) the two certifications; § 541.7(a) thirty calendar days from the date the charge was last incurred, (b) the NVOCC's own thirty days from the invoice it received, (c) the NVOCC acting in both roles, (d) the corrected invoice to the right party still inside thirty days; § 541.8, at least thirty days to request mitigation, refund or waiver and thirty for the billing party to attempt resolution. Part source 89 FR 14362, 26 February 2024; § 541.6 as published at 89 FR 14363 · checked 2026-10-18
- 46 CFR § 545.5, Interpretation of Shipping Act of 1984 — Unjust and unreasonable practices with respect to demurrage and detention — subsection (c)(2)(ii), "Empty container return. Absent extenuating circumstances, practices and regulations that provide for imposition of detention when it does not serve its incentivizing purposes, such as when empty containers cannot be returned, are likely to be found unreasonable"; (b), the same definition folding in "per diem"; (e), "Transparent terminology", under which the Commission may consider "the extent to which the definitions differ from how the terms are used in other contexts". Published at 85 FR 29665, 18 May 2020 · checked 2026-10-18
- Federal Maritime Commission, Demurrage and Detention Billing Requirements Properly Issued Invoices Provision Set Aside by Court, final rule, 90 FR 60579, published and effective 29 December 2025: the court severed and set aside 46 CFR 541.4 and "this rule removes 46 CFR 541.4 from the Code of Federal Regulations. The other provisions of the rule remain in effect." · checked 2026-09-29
- Docket operational baseline, import–export desk · checked 2026-08-08